QESHM OVERSEA-CROSSING 230 kV DOUBLE-CIRCUIT TRANSMISSION ‎LINE‎

PERIOD:‎ ‎1988 – 1992‎

EMPLOYER:‎ Hormozgan Regional Electric Company

TECHNICAL SPECIFICATIONS:‎ The shortest distance between the island and land for ‎overhead transmission line was selected with a length of 3300 m. Two specific features of this ‎project were the necessity of using very long spans and ‎making necessary arrangements for installation of tower in ‎the sea which were implemented. The tallest tower used in ‎this project is about 140 m in height and 135 tons in ‎weight. Pad size is 30 x 30 x 70 and chimney is ‎‎70 m high.‎

LOCATION:‎ Qeshm Island, Hormozgan province‎

STAGE:‎ Permanently delivered

MOSHANIR’S ROLE:‎ All phases of design, factory tests and supervision on ‎construction work.‎

SPECIAL ACHIEVEMENTS:‎ Construction operation of this project is unique in its ‎kind, and all foundation construction work (especially ‎Caisson foundation on the sea bed) installation of tower and ‎cabling were carried out with special arrangements and a ‎very precise and complicated engineering calculations.‎

Back to previous page
More Info:

Moobed Namazi

Tel: +9821-84781121

E-mail: m.namazi@moshanir.co