MASJED SOLEYMAN DAM AND POWER PLANT‎

PERIOD:‎1995 – 2010‎

EMPLOYER:‎ Iran Water and Power Resources Development Company

TECHNICAL SPECIFICATIONS:‎ This dam is on Karun river, it is a clay core rockfill dam, ‎and 177 m high at base. It has 5 radial spillway gates with ‎an inflow of 2300 m3/s (PMF). The power plant consists of ‎four 250-MW turbine generators.‎

LOCATION:‎ ‎25.5 km away from northeast of Masjed Soleyman town

STAGE:‎ Masjed Soleyman Dam was impounded in 2000, and power plant ‎units were connected to the national grid between 2002–2003, ‎minor and complementary work of the project lasted until ‎‎2010.‎

MOSHANIR’S ROLE:‎ Moshanir has performed all phases of engineering services ‎including reconnaissance, phases 1, 2 and 3 based on a joint ‎venture agreement.‎

 