MESHKIN SHAHR GEOTHERMAL POWER PLANT‎

PERIOD:‎ ‎2007 – 2015‎

EMPLOYER:‎ Renewable Energy Organization of Iran

TECHNICAL SPECIFICATIONS:‎ ‎25 MW Geothermal Power Plant

LOCATION:‎ Northern slopes of Mount Sabalan

STAGE:‎ Drilling of 11 wells and construction of a 5 MW Pilot Power ‎Plant

MOSHANIR’S ROLE:‎ Designing and supervision on construction of access road to ‎drilling site, construction of 5 drilling sites, ‎construction of 5000 m3 water storage tank, two pumping ‎stations, indoor warehouse, drilling of 11 geothermal wells, ‎performance of geo-physical tests and studies, geothermal ‎well flow testing, construction of Alvenius pipe line, and ‎well logging.‎

SPECIAL ACHIEVEMENTS:‎ This power plant is the first geothermal power plant in Iran ‎which aims to use renewable energy as an alternative source ‎of power supply.‎